GPO

GPO

Projects as a Client

Initial simulation study and analysis of Line K of the National Railroad Network of Mexico for GPO

The objective of this project is to analyze the circulation time between the different significant points of the network.

Projects as a Colaborator

Simulation of a railway terminal for the transport of goods for VIIA

Determine the maximum capacity of the terminal in number of trains/day depending on the development phase of the railway structures