Home » Success Stories »
The desire ofAENA to have a terminal that complies with IATA quality standards originated this capacity and flow study of the new airport terminal area that should allow defining rectifications in the construction design or the configuration of the initial processors of the new South terminal .
This second study was carried out for three different days that allowed us to see how the airport’s demand would evolve in the short, medium and long term.
Objectives: